Article
Publication date: 13 May 2021

Zul-Atfi Bin Ismail

The contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key…

611

Abstract

Purpose

The contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.

Design/methodology/approach

This paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.

Findings

Conventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.

Originality/value

The conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 March 2022

Zul-Atfi Bin Ismail

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research…

Abstract

Purpose

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research has mainly focused on theoretical models of acceptance in the green building (GB) maintenance industry. However, BIM has the potential to the competency’s performance and design knowledge of building control instrument. Realising this potential requires a study of BIM at the maintenance planning level, which is considered to be BIM-based model checking (BMC). BMC and its effect in the maintenance planning have not been sufficiently investigated.

Design/methodology/approach

The aim of this paper is to present a critical review of literature on the theoretical background of BMC practices and the main features of information and communication technology tools and techniques in the GB maintenance projects.

Findings

A theoretical framework of BMC is developed and presented. The proposed model incorporates requirement for maintaining a competency’s performance on maintenance planning schemes of GB projects and the importance of early integration of BMC in the design phase to identify alternative methods to cogenerate, monitor and optimise BMC.

Originality/value

It is found that variables facilitating BMC are integrated at different GB maintenance environments levels and are shaped by the context. Directions for future research are presented.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 October 2020

Zul-Atfi Bin Ismail

While the adversarial nature of precast concrete (PC) building construction is frequently cited in the PC building construction press, only a few researchers have investigated…

Abstract

Purpose

While the adversarial nature of precast concrete (PC) building construction is frequently cited in the PC building construction press, only a few researchers have investigated construction supply chain management within the construction industry. Due to the interdisciplinary transportation environment, which inevitably results in disruption, the uses of construction supply chain and recovery from construction supply chain risk must be a subject of real interest, yet transportation management research in this area is scarce.

Design/methodology/approach

The purpose of this study is to discuss the weakness in system approaches and their application for managing precast concrete building in the context of construction supply chain practice and how to overcome it. As a precursor to this paper, the paper reviews current construction supply chain management occurrence on PC building construction and explores the hybrid intelligent vehicle tools and techniques currently being used on such management. This paper also presents the new hybrid intelligent vehicle-based approach to manage construction supply chain risk and reduce associated tension on PC building construction schemes.

Findings

The findings reveal the need for more sophisticated construction supply chain management solutions which accord with the needs of PC building construction schemes.

Originality/value

The paper concludes by presenting a research framework for developing such a system in the future.

Details

World Journal of Engineering, vol. 18 no. 4
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 8 May 2018

Zul-Atfi Bin Ismail

The current maintenance management method has affected the efficiency of the building facility management at Polytechnics. Many issues such as poor service delivery, inadequate…

Abstract

Purpose

The current maintenance management method has affected the efficiency of the building facility management at Polytechnics. Many issues such as poor service delivery, inadequate finance, poor maintenance planning and maintenance backlogs have emerged due to the usage of conventional method application (paper-based form and unsystematic database. The purpose of this paper is to review existing literature and case studies project of the technologies in maintenance management at Polytechnic, and subsequently to identify the challenge in improving the current maintenance management technologies.

Design/methodology/approach

The purpose of this paper is to review existing literature and case studies project of the technologies in maintenance management at Polytechnic, and subsequently to identify the challenges of information and communication technology (ICT) implementation for strategic defect diagnosis and decision-making in improving the current maintenance management technologies. Eight Polytechnics are selected on the basis of the major problems of using the conventional method in the comparison to investigate the maintenance management practices in each Polytechnic. There are around 32 Polytechnics in Malaysia and most are using conventional methods.

Findings

The findings reveal the need for a more sophisticated maintenance management system that provides guidelines for decision-making processes with the implementation of ICT. The interview results also reveal irregularities within the Malaysian Polytechnics’ maintenance management database. The system architecture and the information system prototype are presented to integrate the information database and maintenance management processes in improving the building diagnosis approach and decision-making process for managing building maintenance.

Originality/value

This new system is expected to become the successful technology in assisting the maintenance contractors, clients and developer for effective management of maintenance defects at Polytechnic.

Article
Publication date: 6 September 2022

Zul-Atfi Bin Ismail

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and…

Abstract

Purpose

The improper evaluation and information management of circular economy (CE) (i.e. design, planning, supply chain, waste pile and material hazard) is critical for public health and is a major problem in the waste management of precast concrete (PC) building manufacture and construction and demolition wastes industry. The CE model is particularly problematic for PC building construction projects where the standard practices for the total number of waste building materials are not appropriate and do not match the safe disposal design specification, such as the recent number increase in the Malaysian illegal construction waste pile during the Movement Control Order (11 March 2021, about 5 out of 29 landfills related to states enforcing Act 672). The study aims to develop a framework application (i.e. Building Information Modelling [BIM]) that supports intelligent waste recycling management and sophisticated CE model system solutions.

Design/methodology/approach

Thus, the development of a new BIM-based programming algorithm approach is proposed for optimising CE in accordance with the needs of the current PC building construction schemes. As a precursor to this study, the concepts of CE practices are reviewed and the main features of BIM tools and techniques currently being employed on such projects are presented.

Findings

Sophisticated CE system solutions are described as an essential component of this optimisation to reduce the amount of waste generated at the end of the life cycle of PC building construction projects and to better manage the resources used throughout it.

Originality/value

Finally, the potential for a research framework for developing such a system in the future is presented.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 21 May 2018

Zul-Atfi Bin Ismail

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…

1894

Abstract

Purpose

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.

Design/methodology/approach

This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.

Findings

The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.

Originality/value

The paper concludes by presenting a research framework for developing such a system in the future.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 April 2021

Zul-Atfi Bin Ismail

Improper evaluation and information mismanagement concerning thermal comfort appears to negatively affect occupants' satisfaction and building energy consumption in precast…

Abstract

Purpose

Improper evaluation and information mismanagement concerning thermal comfort appears to negatively affect occupants' satisfaction and building energy consumption in precast concrete (PC) building contexts. Predictive models are particularly problematic in PC building construction projects where natural ventilation levels do not coincide with occupants' thermal comfort and thermal sensation specifications.

Design/methodology/approach

A systematic literature review is undertaken to explore the viability and benefits of a new ICT-based approach for meeting social and environmental objectives.

Findings

Sophisticated thermal comfort system solutions are essential for optimising thermal comfort and saving energy in PC building construction projects.

Originality/value

It is imperative that designers and manufacturers are kept up-to-date with the possibilities and potentials associated with new and nascent technologies so that building projects can meet key sustainability criteria.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 September 2021

Zul-Atfi Ismail

The conventional methods practiced by Development and Facilities Management Unit (UPPF) faced issues due to management deficiencies and negligent staffs to handle operation and…

362

Abstract

Purpose

The conventional methods practiced by Development and Facilities Management Unit (UPPF) faced issues due to management deficiencies and negligent staffs to handle operation and maintenance processes of Chemical Facility (CFs) management at Malaysian Polytechnic. The prime objective of this paper is to improve the conventional methods which tend to be both cumbersome and ineffective in the Maintenance Management Systems (MMS) for UPPF at Malaysian Polytechnic.

Design/methodology/approach

Primary data was gathered through the interview to develop the proposed system. The major conclusion drawn from the interview results was that there is a lack of comprehensive MMS that integrate operation and maintenance processes of CF management and software programming that provide the guides for decision-making processes. The interview results also revealed irregularities within the Malaysian Polytechnic's maintenance management database.

Findings

The conventional methods had significantly little emphasis on defect diagnosis tools. It had also increased the inadequate strategic decision making to analyse information in improving the maintenance project outcomes for Malaysian Polytechnic's building. New MMS tools is suggested from findings and lessons learned as a good practice to reduce the frequent overhauling and repairs on the durability's performance and design of building control instrument.

Originality/value

The new MMS potentially transform operation and maintenance processes of CF management into one of the most sophisticated technologies by providing access to all information published by all Malaysian Polytechnics institutions. This is in order to foster financial cooperation, the idea that being that Polytechnics who compete with one another become financially independent towards successful achievements of CF management for laboratory building and equipment.

Details

Journal of Quality in Maintenance Engineering, vol. 28 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 18 October 2022

Zul-Atfi Ismail

The chemical plant (CP) maintenance industry has been under increasing pressure by process designers to demonstrate its evaluation and information management of model checking…

Abstract

Purpose

The chemical plant (CP) maintenance industry has been under increasing pressure by process designers to demonstrate its evaluation and information management of model checking (MC) on the durability’s performance and design of plant control instrument. This main problem has been termed as imperfect maintenance actions (IMAs) level. Although IMAs have been explored in interdisciplinary maintenance environments, less is known about what imperfect maintenance problems currently exist and what their causes are, such as the recent explosion in the Beirut city (4 August 2020, about 181 fatalities). The aim of this paper is to identify how CP maintenance environments could integrate MC within their processes.

Design/methodology/approach

To achieve this aim, a comprehensive literature review of the existing conceptualisation of MC practices is reviewed and the main features of information and communication technology tools and techniques currently being employed on such IMA projects are carried out and synthesised into a conceptual framework for integrating MC in the automation system process.

Findings

The literature reveals that various CP designers conceptualise MC in different ways. MC is commonly shaped by long-term compliance to fulfil the requirement for maintaining a comfortable durability risk on imperfect maintenance schemes of CP projects. Also, there is a lack of common approaches for integrating the delivery process of MC. The conceptual framework demonstrates the importance of early integration of MC in the design phase to identify alternative methods to cogenerate, monitor and optimise MC.

Originality/value

Thus far, this study advances the knowledge about how CP maintenance environments can ensure MC delivery. This paper highlights the need for further research to integrate MC in CP maintenance environments. A future study could validate the framework across the design phase with different CP project designers.

Details

Industrial Management & Data Systems, vol. 123 no. 11
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 28 January 2020

David Oloke

Abstract

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 1
Type: Research Article
ISSN: 2398-4708

1 – 10 of 10